SCADA // LIVE TELEMETRY

MeFawn Metro Simulator

Every lever below comes from the value chain and the PESTEL analysis. The output is the one thing the company exists to maximise: the number of people who use the metro. Money is not an output here, it is the ceiling on what the service can be.

If you set the service by hand, this is where it ends up in the long run

Users
468.7
M trips/year · 2024 base
Service budget
286.6
M€/year
Financial balance
0.0
funds − cost, M€/year
Fleet
180
trains · 12.5 years old

Decisions

Sliders start at the 2024 operating point.

SERVICE

What the user actually experiences. Operations, inbound and outbound logistics in the value chain. The controller below moves the first one for you.

164
1.10
165
7.2trains/yr

BUDGET

Money in = subsidy + trips × fare. It buys no user by itself; it decides which service levels are affordable.

215M€/yr

OUTSIDE THE COMPANY

Set by the ATM or by the world. In the model these are disturbances, not decisions.

0.48€/trip
0%
Strikes, works, a crisis, a new competitor.

The network, alive

Stations, trains, reserve, passengers and affordability follow the sliders. Press play and the closed loop builds the service month by month, lags included; new stations open gradually until the number you chose.

train age, new to worn trains beyond the subsidy small dots: passengers on the platform

How many users the service can carry

Long-run users against the number of peak-hour trains, at the reserve ratio, stations and fare you set.

your renewal rate renewal matched to the fleet beyond what the subsidy pays for

Interactive 3D Response Surface (Plotly)

Ridership surface across service variables. Colored by Financial Balance.

Rotate, zoom, and hover over the surface to inspect exact user counts and fiscal balance for any configuration.

Closed loop: a PID that buys service

The controller compares the users it measures with the target and moves the service budget. Its only hard limit is the money available.

500
4.80
0.28
20.0
users target service budget budget ceiling

Closed loopUsers reachedSettling (2 %) OvershootService budget

What the model is

Users follow a constant-elasticity demand index with a market ceiling of 750 M trips/year. The elasticities at the 2024 point are +0.30 on peak-hour trains, +0.10 on the reserve ratio, +0.42 on stations, −0.35 on the fare and −0.010 per extra year of fleet age; they were fitted on TMB metro data 2010–2025 and reproduce that history with a mean absolute error of 2.9 %. Service reaches the street with a time constant of 12 months and travel habits follow with 6.5 months. The fleet is the reserve ratio times the peak-hour trains, and it settles at an average age of fleet ÷ (2 × renewal). Full equations and the controller are in pid.py.